Flow Assurance and pipelines integration studies for 250 crude oil well bore

  • Customer Name: 2B-OPCO Company
  • Location: Sudan-هجليج
  • Contractor: Petroproject Company
  • Type: Engineering
  • Duration: 1,876 Hr.
  • Scope :

    Process Engineering
    Chemical Engineering
    Mechanical Engineering